How much drywall for a 10×10 room?

A 10×10 ft room with 8 ft walls needs 15 sheets of 4×8 drywall for the walls and ceiling, or 11 sheets for the walls only, including 10% waste.
10 ft10 ft8 ft
ItemAmountEst. cost
4×8 ft sheets (1/2 in)15 sheets$180–$270
Joint compound (4.5 gal bucket)2 buckets$34–$50
Paper tape (500 ft roll)1 roll$6–$10
Drywall screws3 lb$18–$30

40 ft perimeter × 8 ft = 320 sq ft of wall, plus 100 sq ft of ceiling = 420 sq ft. Plus 10% ÷ 32 sq ft per sheet = 15 sheets.

By sheet size

SheetWalls+ ceilingCost
4×8 ft1115$238–$360
4×10 ft912$238–$366
4×12 ft810$238–$370

Taller walls

WallsAreaSheetsCost
8 ft420 sq ft15$238–$360
9 ft460 sq ft16$250–$378
10 ft500 sq ft18$274–$414

Walls and ceiling, 4×8 sheets, 10% waste. Cost includes compound, tape and screws.

Your room is different?

Many pros skip deducting small openings and use offcuts instead.
Sheets to buy
15 sheets
420 sq ft to cover
Total $238–$360
10 ft10 ft8 ft
ItemAmountEst. cost
4×8 ft sheets (1/2 in)15 sheets$180–$270
Joint compound (4.5 gal bucket)2 buckets$34–$50
Paper tape (500 ft roll)1 roll$6–$10
Drywall screws3 lb$18–$30

Use 1/2 in board on walls, and 5/8 in on ceilings with framing 24 in apart or where code requires fire-rated board.

Frequently asked questions

How many sheets of drywall for a 10×10 room?

15 sheets of 4×8 drywall for the walls and ceiling of a 10×10 ft room with 8 ft walls, including 10% waste. The walls alone take 11 sheets.

How many 4×12 sheets for a 10×10 room?

10 sheets of 4×12 for walls and ceiling, or 8 for the walls only. Longer sheets mean fewer seams to tape, but they need two people to hang.

How many square feet of drywall is a 10×10 room?

The walls are 40 ft around × 8 ft = 320 sq ft, and the ceiling is 100 sq ft, for 420 sq ft in total. Most pros don't subtract doors and windows and use the offcuts instead.

How much does it cost to drywall a 10×10 room?

Materials run about $238–$360 with 4×8 sheets: board, 2 buckets of joint compound, 1 roll of tape and 3 lb of screws. Hiring a pro to hang and finish usually costs several times more.